New Energy Grid Connection Case Study

New Energy Grid Connection Case Study

Supported the completion of insulation testing for 1000km of DC cables at a Qinghai photovoltaic power station. The system was equipped with a DC high-voltage generator and partial discharge monitoring module, ensuring the stability of ±800kV DC transmission lines in extremely cold environments and reducing the new energy grid connection loss rate by 3%.